14-week cycles mirror half-marathon prep: progressive overload for life-support torque (12Nm peak), 99.4% uptime audits. Data from robotics lab transferred to dome maintenance drills.
Week 1-4: baseline sensor calibration.
Week 5-8: load-bearing sims at 1.2x Earth gravity equiv.
Week 9-14: failure-mode recovery at 99.4% target.
Grounded in STEM curriculum outcomes. Back to home